Continuous Improvement (Lean & Green Manufacturing)
2016
- Built a Training Center for casting Excellence (Dedicated to Art Abbey)
- Procured a Wax 3D Printer to offer Rapid Prototyping
- Shell Room De-humidification Implemented
2015
- Added 3 New 5 Axis CNC machines
- Built out 1000sq ft new Manual Machining Facility
- Streamlined Wax Injection Operations to reduce lead times
- Held a Quality Clinic introduction class with UTC (Implemented)
- Modified product scrap area (Poka Yoke)
2014
- Cast Floor LEAN event (6 mo's long) Improve Quality
- 1 New 5 Axis CNC
- 2 New 600 lb Aluminum Melters
2013
- Machining Center Reorganization
- New FEELER CNC 4 Axis
- Aluminum Heat Treating
2012
- 1000 sq ft Secure Tooling and Document Storage
- 6000 sq ft Machine Shop
- 2- 60hp 125 psi 250cfm Air Compressors
- LEAN Work Flow of Shell Room
- LEAN Work Flow for Knock-out
- Recirculation and Oxidization for Water Blast Water
2011
- Boeing Supplier “Silver Performance Award” Working for Gold…
- Marketing and Website Strategies
- Move toward electronic record keeping
- Completion of Materials Testing Certification
- Wax Injection; Improved Filter Fabrication
2010
- BeCu Containment Cell
- Goodrich AG and AATC LWW Tool Movement
- The Boeing Company GEMBA walk
- 1000 days ZERO Lost Time Accident Luncheon
- Goodrich AG and AATC one piece Airplane factory with all supervisors
- Sundyne(UTC) Supplier Gold Lean Assessment
- Financial and Manufacturing Connections Information Technology
2009
- Standard Work in Process (SWIP) Introduction and training
- NDT Lean Event
- Machine Shop mini lean event
- Materials Testing 2009-Current
2008
- Goodrich AG and AATC Sales Orders receipt to release
2007
- Goodrich AG and AATC ANDON LIGHTS training and investigations
- Goodrich AG and AATC straightening 5S
- AATC relocation Event
- Sundyne (UTC) Supplier Gold Philosophy and Vision
2006
- AATC Records requirements, retention, and Flow
- AATC outside process flow and responsibilities
- AATC cross training and trouble tickets
- Goodrich AG and AATC straightening 5S
2005
- FACC AG and AATC Kit flow product movement and packaging
- AATC visual Inspection 5S and Flow parameters
- AATC maintenance and outside grounds 5S
- AATC Quality Assurance Administration 5S
2001
- The Boeing Company and AATC value stream